Workeey is built for your phone. Scan the code with your phone to get the Android app, or open workeey.com on your phone. The iPhone app and a desktop version are coming soon.
Get the Workeey app. Same account, same jobs.
In Alabama a job up to $10,000 on a home needs no state contractor license (home roofing over $2,500 needs a license). Plumbing, electrical and HVAC: state license. Read from Alabama's own pages, checked November 6, 2026.
The limit: Up to $10,000 per job (homes); home roofing over $2,500 needs a license. In short: residential work up to $10,000 per job (labor + materials + overhead + profit) needs no home builder license; roofing over $2,500 does; electrical, plumbing, gas and HVAC work need their own state license at any price.
What counts: "when the cost of the undertaking exceeds ten thousand dollars ($10,000)"; "COST OF THE UNDERTAKING. The total cost of the materials, labor, supervision, overhead, and profit." Materials count toward the limit, not just your labor.
Conditions: residential roofing over $2,500 needs a license; electrical, plumbing/gas fitting and HVAC work require their own state license/certification regardless of job size; applies to residential structures up to three floors / four units.
Alabama has no 'handyman license'. The $10,000 line comes from the residential home builder law; commercial work is governed by the General Contractors Board from $100,000.
General contractors: State license. Commercial/general: license from the General Contractors Board when the undertaking is $100,000 or more (raised from $50,000 by Act 2024-277, effective Oct 1, 2024). Residential: Home Builders Licensure Board license when the cost exceeds $10,000 (roofing: over $2,500).
Plumbing: State license. Plumbers & Gas Fitters Examining Board: anyone doing plumbing or gas fitting must hold a Board certification; companies must register.
Electrical: State license. Alabama Board of Electrical Contractors; unlawful for an unlicensed person to solicit or perform electrical contracting (Ala. Code § 34-36-16(b)).
HVAC: State license. Alabama Board of Heating, Air Conditioning and Refrigeration Contractors certifies HVAC/refrigeration contractors (Ala. Code § 34-31-24).
Your license number: Home builders must show the number on contracts and advertising. HVAC contractors must show the number on invoices, estimates, quotes, letterhead, all documentation, advertising and vehicles.
In the rule's words: “Residential builders: "the contract shall contain the licensee's license number issued by the board. (g) Whenever a licensee engages in advertising, the licensee shall ensure that the licensee's valid license number issued by the Board is displayed." HVAC (Ala. Code § 34-31-24(a)(2)): "shall display the contractor's certification number and the company name on all documentation, forms of advertising, and on all service and installation vehicles"; HVAC Board FAQ: "all invoices, estimates, quotes, letterhead, etc."” (Ala. Code § 34-14A-7(f)-(g) (home builders); Ala. Code § 34-31-24(a)(2) and Ala. Admin. Code r. 440-X-5-.07 (HVAC))
Two of the heating and air board's own pages cite the license-number rule under different subsections of the same law. The rule is the same.
The board: Alabama Home Builders Licensure Board (residential); Alabama Licensing Board for General Contractors (commercial). As of November 6, 2026. Dates on the state's pages: HBLB law effective June 1, 2025, GC Board Act 2024-277 page posted 2024-09-30, updated 2025-06-03 and HACR law/rules file 10-17-2024.
This is a summary of each state's own pages as of November 6, 2026, not legal advice. Rules change, and cities and counties add licenses of their own. Check with your state's board, linked on this page, before you rely on it.
Compare Alabama with every state's limit.
10 of Alabama's own pages, each quoted with its link:
Every state in one file: Excel and CSV downloads