Workeey is built for your phone. Scan the code with your phone to get the Android app, or open workeey.com on your phone. The iPhone app and a desktop version are coming soon.
Get the Workeey app. Same account, same jobs.
In Arizona a job under $1,000 needs no state contractor license (only if no building permit is needed, casual or minor work). Plumbing, electrical and HVAC: state license · not fully confirmed. Read from Arizona's own pages, checked November 6, 2026.
Not fully confirmed. For Arizona, plumbing, electrical work and HVAC could not be checked on the state's own pages: each says so below.
The limit: Under $1,000 per job; only if no building permit is needed, casual or minor work. In short: under $1,000 per project, labor + materials + everything else; no permit; casual or minor work; ads must say "not a licensed contractor"
What counts: "one undertaking or project by one or more contracts, for which the aggregate contract price, including labor, materials and all other items, but excluding any electrical fixture or appliance that was designed by the manufacturer, that is unaltered ... is less than $1,000" Materials count toward the limit, not just your labor.
Conditions: work must be of a casual or minor nature; no local building permit required; not part of a larger operation or split into contracts under $1,000 to evade licensing; any advertising must include the words "not a licensed contractor"
General contractors: State license. ROC license required for any contracting outside the handyman exemption (from $1,000, or any job needing a permit). Separate residential, commercial and dual licenses, general and specialty.
Plumbing: State license · not fully confirmed. Licensed as an ROC specialty contractor classification (residential/commercial/dual); no separate state journeyman license found. The state contractor board's site could not be read, so the names of the trade license classes for plumbing, electrical and HVAC work are not confirmed; the trade rows rest on the state's general license law.
Electrical: State license · not fully confirmed. Licensed as an ROC specialty contractor classification (residential/commercial/dual). The state contractor board's site could not be read, so the names of the trade license classes for plumbing, electrical and HVAC work are not confirmed; the trade rows rest on the state's general license law.
HVAC: State license · not fully confirmed. Licensed as an ROC specialty contractor classification (air conditioning and refrigeration). The state contractor board's site could not be read, so the names of the trade license classes for plumbing, electrical and HVAC work are not confirmed; the trade rows rest on the state's general license law.
Your license number: Licensed contractors must show the number on bids, estimates, advertising, letterheads, other documents used to correspond with customers and job site. None of these rules names invoices.
In the rule's words: “On all written bids and estimates submitted by the licensee. ... On all published advertising, letterheads and other documents used by the licensee to correspond with the licensee's customers or potential customers in the conduct of business regulated by this chapter.” (A.R.S. § 32-1124(B))
The board: Arizona Registrar of Contractors (ROC). As of November 6, 2026.
This is a summary of each state's own pages as of November 6, 2026, not legal advice. Rules change, and cities and counties add licenses of their own. Check with your state's board, linked on this page, before you rely on it.
Compare Arizona with every state's limit.
6 of Arizona's own pages, each quoted with its link:
Every state in one file: Excel and CSV downloads